Location
10, 1st Setunsky passage, Moscow.
Tasks
Draft concept of reconstruction and development of the territory.
About the project
Replacement of the shopping and warehouse complex with a class "B" office and business center.
Action program:
•
primarily the preservation of existing building sites
•
the development of a network of driveways and parking lots
•
reinforcement of load-bearing and enclosing structures
•
optimization of the heights of floor-to-floor ceilings and combined superstructures to achieve the specified output parameters of the total area of the premises
In some cases, cantilever extensions are assumed. As part of the new construction, the organization of flat roofs of buildings is proposed. Depending on the individual task, these roofs can be concentrated as operational terraces.
The exterior decoration uses the technology of ventilated facades with Max-panels and granite cladding.
Landscaping of territories:
•
organization of pedestrian zones, recreation areas, and catering areas
•
optimization of pedestrian and traffic flows
•
landscaping in development-free areas

Setun-Base Park
total pages
[ 24 ]